Doc.No : QR(9)-1001
Date : 09/15
PREDICTED USAGE

Hong Kong China Concrete Company Limited
Hong Kong Concrete Company Limited
DAILY DESPATCH SHEET

OPENING STOCK
Random inspection of residues in truck mixer
Truck No. Inspected by
A.M.
P.M.
A.M. P.M.
Moisture: 20mm A.M. P.M.
10mm A.M. P.M.
S/F A.M. P.M.
R/S A.M. P.M.
Temperature:
CUSTOMER / SITE Job No. MIX Qty (m3) MIX CODE 7 8 9 10 11 12 1 2 3 4 5 6 7 Total Remark
Man Kit Construction 1 45/20/100 300 MCP214 12345 12345 12345 12345 12345 12345 12345 12345 12345 12345
28 12 28 28 28 28 28 12 28 28
Pen Size :
Pen Color :
BOOKING TOTAL:
DAYS TOTAL:
MONTH TOTAL:
ORDERED QUANTITY:
DELIVERED QUANTITY: